1Symptom
DO in some or all zones runs well above setpoint (for example 4 to 6 mg/L at the end of the basin) and blower power is high for the load. Pin floc or poor denitrification may show up as side effects.
2Check first
- Compare DO by zone and time of day with the setpoints.
- Check minimum airflow per diffuser: many systems must run a minimum air rate for mixing and diffuser health, which can push DO high at low load.
- Check valve positions. With most open valve control, one valve should be near open; if all valves are pinched, header pressure is too high.
- Check whether the blowers are running at a turndown limit.
3Possible causes
- Air needed for mixing exceeds air needed for oxygen at low load.
- Poor DO control tuning or DO setpoints set higher than needed.
- Too many blowers in service, or a blower that cannot turn down far enough.
- Low load periods (nights, weekends) with fixed air rates.
4Next investigation
- Calculate oxygen demand and compare the air rate with what the diffusers need for mixing.
- Trend kWh per pound of BOD or ammonia removed as a performance metric.
- Look at whether nitrate in recycled flows carries DO into anoxic zones.
5Corrective actions
- Lower DO setpoints step by step where ammonia stays low (many plants run 1.0 to 2.0 mg/L).
- Consider ammonia based aeration control so air follows load.
- Tune or enable most open valve pressure control.
- Take a zone off aeration and use intermittent aeration or mixers if the design allows.
- Review blower sizing; a smaller blower for low flow seasons can save a lot.
6When to call for help
- Lowering air causes ammonia bleed-through or poor mixing.
- You plan control changes in the SCADA logic.
Make one change at a time, record it, and follow your plant procedures and permit. If you suspect a toxic discharge, a safety hazard or a permit violation, notify your supervisor right away.
This guide also appears on ActivatedSludge.com, our consulting site. Results are for training and operator use; always follow your plant’s procedures.